Project Master connects estimating, project delivery, and back-office work for contractors — built around how construction companies already work, not against it.
Every part of the job, connected — not six different spreadsheets that quietly drift out of sync.
Rates change going forward, never backward. Every BOQ snapshots its own price, permanently.
Labour, equipment, and materials, driven by productivity — not a guessed flat number.
Define your own roles and permissions. New hires get the right access the moment they're added.
Export a clean, sectioned bill of quantities your client can read — with no cost or markup on it.
Turn an approved BOQ into a live project and watch budget against actual as the job runs.
Your price list feeds every rate build-up, so a rate is entered once and used everywhere.
Set up labour, materials, and equipment once. Build simple flat rates or full labour + equipment + material build-ups.
Sections, line items, contingency and markup, in your own categories. Approve it when it's ready to submit.
An approved BOQ becomes the project budget automatically. Track cost against it as work happens.
A simplified view of the BOQ builder — priced items pulled straight from your price list, snapshotted the moment they're added.
Project Master's rate build-up methodology wasn't invented in the abstract — it was built by analysing real quantity-surveying rate build-ups and real project cost-variance reports, the kind contractors already produce in Excel every week.
The goal from day one has been to match how estimators and project managers already think, so adopting the system feels like a better version of your existing process, not a foreign one.
BOQ estimating and project tracking are live today. Here's what's shipping next.
No. You can build a BOQ in the system and convert it into a project, or quick-start a project you already won elsewhere — you'll just enter your budget as categories with lines and amounts beneath them, so tracking has real structure from day one. A converted BOQ's categories are named after your own price list categories; a quick-started one uses whatever headings your budget already has. A single lump sum isn't accepted, because it gives cost tracking nothing to compare against.
Nothing. Every BOQ line item snapshots its rate the moment it's added. Changing a price in your price list only affects new line items added after that point.
Yes — set up as many currencies as you need in Settings, each with its own symbol, decimal places, and exchange rate. Individual BOQs and projects can be priced in whichever currency fits that job.
Yes. Every account is scoped to its own company at the database level, and access within your company is controlled by the roles and permissions you set up.
Yes. Download the template from the Import BOQ tab — it has the columns, an example, and your own units, price list items and clients already listed on its Instructions sheet — fill it in, and upload it. There's an Import Project template for budgets you've already priced elsewhere. Rates are always read from your price list rather than the spreadsheet, so imported figures can't drift from the ones the system is pricing against.
Every project has a Cost Value Reconciliation, over five tabs. You get a cost budget beside the actual figure — split by cost code, with a revised budget and a projected cost to complete, so a variance means something. Costs incurred are kept apart from cash: the cost ledger records what you owe, the cash ledger records what has actually moved, and an advance already paid against a cost head is flagged to be deducted so it is never counted twice. On the other side of the margin, certified valuations give you sales to date, contract value, financial and physical progress. The summary then reads the same workbook figures a quantity surveyor would: BAC, earned value, planned value, CPI and SPI — on the same screen as the cost grid, so a headline figure and the rows behind it cannot drift apart. Every ratio shows an em dash rather than a number when its denominator is missing — a project with no contract sum has an undefined CPI, not an infinitely over-budget one.
No, and deliberately so. Everything derives from cumulative figures plus the dates on the ledger rows, so there is no frozen month-by-month snapshot to fall out of step with the ledger. Planned value uses a single planned-progress percentage you enter against the programme, rather than a phasing table the system cannot fill in for you.
BOQ estimating — price lists, rate build-ups, the BOQ builder, and Excel import — is fully live, along with project tracking, project budgets and cost capture. Cost tracking is now a full Cost Value Reconciliation: a real cost budget per cost code, cost and cash ledgers, certified valuations and margin, and an earned-value summary on the same page. Client records and the clients screen under CRM are live too, as is the in-app Knowledgebase: a user guide covering every part of the system, readable by everyone in your company. Leads, contacts and the rest of CRM, plus Finance — invoices, payments and quotations — reporting and HRM, are on the build plan; the module list on this page is kept honest about what's live versus coming.
Questions about a plan, a demo, or just want to talk through your workflow first — reach out directly.
Kampala, Uganda — serving contractors across East Africa.